Hi
When you restore a Max DB database backup, will the database be consistent as at the time when the backup started?
After the downtime phase of a SUM upgrade (about 4 hours downtime), SUM prompts you to complete a data backup before you start the SAP system:
A backup of our Max DB database runs for 3.5 hours. If I start a database backup on this phase above, is it theoretically safe to start the SAP system and continue with the processing, as I will be able to restore the database to this time if required, using the mentioned backup made without rolling logs forward. I'm taking a change but would like to minimize downtime of the SAP system.