Hi SAP expert,
I want to consult about cascade shift.
I have a plant which have cascade shift (average 10 -12 shifts) and there are several shifts which are overlapping.
This shift will intergated with SAP HCM.
How can I configuration for that cascade shift?
Thanks and regards,
Anita